Stryker Brigade Fire Protection Storage Tank

Responsibilities

  • Survey
  • Mapping Control
  • Easement Right-of-Way Plans
  • Base Mapping
  • Courthouse Research
  • Utility Coordination
  • Design of Water Treatment and Pumping Facilities
  • Design of Storage, Distribution, and Transmission
  • Bidding Services
  • Construction Administration
  • Permitting

Owner

Pennsylvania Department of General Services, Huntingdon County

Project Details

This project included the design and construction of a 71,000 gallon water storage tank and fire pump emergency generator control system to provide fire protection to the Department of General Services’ Huntingdon Readiness Center complex.

Project Uniqueness/Challenges:  Due to the potential for standing water to freeze during the winter months, spray foam insulation was applied to the exterior of the tank following construction.

Photos

Keller Engineers has been an extremely valuable asset for us in the development/construction of our store sites by providing accurate and timely structural and site development drawings and answers to related questions.  Their response and turn-around time to the Sheetz Store Development Department has been outstanding. We have no hesitation in turning to Keller Engineers for our store structural and site development needs. Joe S. Sheetz, Executive Vice President, Finance & Store Development Sheetz Corporation

Contact Us Today!

Send Us a Message