CURRENTLY IN DESIGN – New Bus Facility

Responsibilities

  • Survey
  • Base Plan
  • Conceptual Plans
  • Traffic Study
  • Comprehensive Site Development Design
  • Permitting
  • Construction Drawings
  • Design of Parking Lot
  • Landscape Plan
  • Site Lighting Plan
  • Stormwater Management
  • Erosion and Sediment Control
  • Service Laterals
  • Coordination with Project Stakeholders and Sub-consultants
  • Preparation and Submission of Municipal Applications

Owner

Maytav Bus Company, Inc | Camden County, NJ

Project Details

The project includes the construction of a 9,100 SF bus maintenance building, renovation of an existing building, and construction of a parking facility for buses, minivans, and cars. The 1.816 site is presently 100% impervious from a previous use.

Site improvements include one ingress and two egress driveways onto Pine Street, construction of a new 50’ x 70’ three bay bus maintenance facility, renovation of a two-story brick building into offices and a driver’s lounge, parking for 54 buses, 28 minivans, and 11 cars, and utility connections.

Photos

All work products from Keller were outstanding and well prepared. All reports were timely and accurate, making it much easier for project close-out in the design phase. Keller office staff also submitted required documents timely and without error. Keller’s full understanding of the project’s requirements made our work as a municipal department much easier. The City of Camden looks forward to engaging with Keller on future projects and would endorse them for other firms and clients to work with them. Dr. Edward C. Williams, PP., AICP, CSI Director of Planning and Development City of Camden, New Jersey

Contact Us Today!

Send Us a Message