The project consisted of a superstructure replacement and widening of the bridge having three 57’-0” spans. The existing steel superstructure was removed and replaced with new steel I-beams and a concrete deck. The deck and all substructure units were widened to accommodate two traffic lanes. Total project length was 630’-0” including approach roadway and drainage facilities.
The bridge is located directly adjacent a church. Care was taken to minimize impact to the church and associated parking facilities. Additionally, the project included several environmental concerns. Stream disturbance was minimized to avoid impact to a species of concern.
Keller Engineers is the easiest engineer that our Township has worked with. All their engineers and employees are really friendly and helpful. Karen Cregger, Secretary/Treasurer Southampton Township, Bedford County