West Providence Township Municipal Authority Wastewater

Responsibilities

  • Survey
  • Mapping Control
  • Grant and Funding Applications
  • Easement Right-of-Way Plans
  • Base Mapping
  • Courthouse Research
  • Utility Coordination
  • Wetlands Stakeout
  • Design of Wastewater Collection and Pumping Facilities
  • Act 537 Plans
  • Rate and Tap Fee Analysis
  • Infiltration/Inflow Analysis
  • Permitting
  • Bidding Services
  • Construction Inspection and Management

Owner

West Providence Township Municipal Authority

Project Details

The purpose of this project was to eliminate/reduce Inflow & Infiltration from the WPTMA’s collection system. The Authority and the Borough of Everett were under a corrective action plan from the Pennsylvania Department of Environmental Protection.

Contract 1 replaced approximately 8,000 LF of 8” of gravity sewer main, manhole replacement, lateral re-connections, related appurtenances and restoration.

Contract 2 replaced approximately 25,000 LF of 8” gravity sewer main, manhole replacement, lateral re-connections, related appurtenances and restoration.

Contract 3: replaced 3 pump stations.

A new collection system and 3 pump stations were built while maintaining operations of their existing systems.

Photos

We have worked with Keller Engineers for structural and civil engineering support on six projects over the past five years and have been very pleased with the results. Our projects tend to be complicated phased renovation/ addition projects calling for creativity in planning and construction.  I have been particularity pleased with their responsiveness to issues that arise during construction which is of particular importance to us and our clients. Vern L. McKissick, III, AIA, LEED AP, Owner/Architect McKissick Associates