West Providence Township Municipal Authority Wastewater

Responsibilities

  • Survey
  • Mapping Control
  • Grant and Funding Applications
  • Easement Right-of-Way Plans
  • Base Mapping
  • Courthouse Research
  • Utility Coordination
  • Wetlands Stakeout
  • Design of Wastewater Collection and Pumping Facilities
  • Act 537 Plans
  • Rate and Tap Fee Analysis
  • Infiltration/Inflow Analysis
  • Permitting
  • Bidding Services
  • Construction Inspection and Management

Owner

West Providence Township Municipal Authority

Project Details

The purpose of this project was to eliminate/reduce Inflow & Infiltration from the WPTMA’s collection system. The Authority and the Borough of Everett were under a corrective action plan from the Pennsylvania Department of Environmental Protection.

Contract 1 replaced approximately 8,000 LF of 8” of gravity sewer main, manhole replacement, lateral re-connections, related appurtenances and restoration.

Contract 2 replaced approximately 25,000 LF of 8” gravity sewer main, manhole replacement, lateral re-connections, related appurtenances and restoration.

Contract 3: replaced 3 pump stations.

A new collection system and 3 pump stations were built while maintaining operations of their existing systems.

Photos

We have teamed with Keller Engineers on several design-build projects for PennDOT. When selecting a designer, the more critical factors are trust and competence, more so than a low price. If your designer makes a mistake in quantities it can cost you a lot of money. We have stayed with Keller Engineers because we trust them to provide competent service at a competitive price.  S. Scott Grannas, Vice President Grannas Bros. Stone & Asphalt Co., Inc.