Bethel Township, Fulton County
This project involved replacement of the existing Barnett’s Run Road Bridge over Barnett’s Run. The existing structure was a single lane concrete slab bridge on reinforced concrete abutments. The new structure is a two-lane, precast concrete box culvert having a 22’-0” curb to curb width and a clear span of 28’-0”.
Safety of the adjoining intersection was increased by widening the structure to accept two lanes of traffic. The chosen structure pushed the limits for the size of box culverts. By pushing the envelope with this project, the Township saved over $150,000.
We have worked with Keller Engineers for structural and civil engineering support on six projects over the past five years and have been very pleased with the results. Our projects tend to be complicated phased renovation/ addition projects calling for creativity in planning and construction. I have been particularity pleased with their responsiveness to issues that arise during construction which is of particular importance to us and our clients. Vern L. McKissick, III, AIA, LEED AP, Owner/Architect McKissick Associates