Russo Building Demolition

Responsibilities

  • Survey
  • Permitting
  • Asbestos and Lead-based Paint Abatement Coordination
  • Preparation of Demolition Plan and Specifications
  • Bidding and Project Award
  • Construction Administration
  • Wage Rate Verification
  • Coordination with the County of Blair and City of Altoona

Owner

County of Blair, Blair County

Project Details

Keller Engineers was retained to provide engineering services necessary to demolish an abandoned facility and prepare the 2.1-acre site for future commercial development.  The project included an asbestos and lead-based paint report prepared by a sub-consultant. The structure had a concrete frame with concrete floor and roof framing. Concrete columns supported concrete beams and floor system.

Using an on-site mobile crushing operation, the concrete and brick materials from the building were used as fill.  The material was placed in the existing subgrade prior to the construction of a new facility.

I probably don’t say this enough, but we so appreciate the quality of work Keller Engineers does. The fact that they include building footprints and natural features makes these surveys super useful. I’m reminding my colleagues in other counties that their surveyors need to up their quality. F. Mark Schiavone, Executive Director Berkeley County Farmland Protection Board