Red Mill Water and Wastewater System

Responsibilities

  • Survey
  • Mapping Control
  • Easement Right-of-Way Plans
  • Base Mapping
  • Courthouse Research
  • Utility Coordination
  • Wetlands Stakeout
  • Design of Water Treatment and Pumping Facilities
  • Design of Storage, Distribution, and Transmission
  • Rate and Tap Fee Analysis
  • Permitting
  • Construction Inspection and Management
  • Grant and Funding Applications
  • Design of Wastewater Collection and Pumping Facilities
  • Bidding Services
  • Act 537 Plans

Owner

Falls Creek Borough Municipal Authority, Jefferson County

Project Details

This project included the design of a 22,000 LF water system expansion, a 19,000 LF wastewater extension, water storage facility, booster pumping facilities, water treatment plant modification, a computerized treatment process control system, and related appurtenances. The water main was constructed in a common trench with the wastewater extension and included a wastewater pumping station.

Photos

We have teamed with Keller Engineers on several design-build projects for PennDOT. When selecting a designer, the more critical factors are trust and competence, more so than a low price. If your designer makes a mistake in quantities it can cost you a lot of money. We have stayed with Keller Engineers because we trust them to provide competent service at a competitive price.  S. Scott Grannas, Vice President Grannas Bros. Stone & Asphalt Co., Inc.

Contact Us Today!

Send Us a Message