Parking Lot Replacement, Greater Allegheny Campus

Responsibilities

  • Survey
  • Site Planning, Design, and Layout
  • Design of ADA Compliant Curbs and Ramps
  • Parking Lot Design
  • Erosion/Sedimentation Control Plans
  • Stormwater Management

Owner

Pennsylvania State University, Blair County

Project Details

Keller Engineers replaced two existing parking lots on the Greater Allegheny campus of the Pennsylvania State University. Topographic survey and site assessment of the pavement and drainage piping to be replaced was performed. Keller staff prepared the design drawings and specifications for the replacement lots, including new storm inlets and piping.  The parking lot for the dormitory involved replacement of an existing set of stairs with a ramp for improved ADA accessibility into the dormitory and for ease of deliveries and “move-in/move-out” days.

During construction of the dormitory parking lot, the University requested design drawings and bid documents for the replacement of a parking lot/truck court for the campus maintenance building. Keller staff performed quick turnaround on the maintenance building drawings so the client could bid and construct the lot before paving season ended.

Photos

Keller Engineers is the easiest engineer that our Township has worked with. All their engineers and employees are really friendly and helpful. Karen Cregger, Secretary/Treasurer Southampton Township, Bedford County

Contact Us Today!

Send Us a Message