Independence Place/Summit at Shiloh

Responsibilities

  • Survey
  • Permitting
  • Site Planning, Design, and Layout
  • Landscape Plan
  • Grading
  • Utilities Coordination
  • Roadway Design
  • Drainage Improvements
  • Pedestrian Walkways
  • Construction Administration
  • Summit at Shiloh: Design of all building structure elements

Owner

The Patt Organization, Centre County

Project Details

Independent Place included the design and layout for a 139-unit single and multi-family home development.  The neighborhood includes a community clubhouse, swimming pool, basketball and tennis courts, and walking trails.

Additionally, the development includes The Summit at Shiloh, two 50,000 SF, 24-unit, three-story condominium buildings with underground parking facilities. The structural design components include wood/steel frame, brick facade, beams, lintels, headers, foundation, and concrete.

Photos

Penn Cambria School District has collaborated the last 4 years with the Keller Engineer’s team to complete a multi-phased paving and drainage project on our HS campus. I have personally worked with Adam Long, Brian Smith and Shawn Ritchey throughout the entire project and they made Penn Cambria feel like we were their only client. The personal attention to our needs and specific details of this project were second to none. The communication aspect of the Keller Engineer Team was outstanding. We trust their process, their design and their commitment to a quality project that when completed, we are all very proud of. Bill Marshall, Superintendent Penn Cambria School District

Contact Us Today!

Send Us a Message