Express E-Z Pass Improvements at Interchange 6 Toll Plaza

Responsibilities

  • Provide On-site Project Construction Inspection
  • Participate in Monthly Progress Meetings
  • Coordinate Independent Lab Testing
  • Maintain Daily Inspection Reports in CAPEX
  • Prepare As-builts
  • Provide Resident Engineer with Quantities for Monthly Payment Vouchers
  • Conduct Final Inspection
  • Resolve Punch-list Items
  • Prepare Closeout Documentation

Owner

New Jersey Turnpike Authority

Project Details

Two Keller Engineers of New Jersey construction inspectors were responsible for overseeing the construction of this $7.1M project that included the addition of two express E-Z Pass lanes, demolition of two toll booths and islands, monotube structures, advanced signage, and drainage improvements.  Other construction activities included roadside protection, concrete demolition and doweling new pavement into the adjacent lane, drilled shafts foundations, sign structure pedestals, HMA placement, traffic striping and pavement markings, concrete curb, and use of precast barrier to facilitate MPT.

Photos

All work products from Keller were outstanding and well prepared. All reports were timely and accurate, making it much easier for project close-out in the design phase. Keller office staff also submitted required documents timely and without error. Keller’s full understanding of the project’s requirements made our work as a municipal department much easier. The City of Camden looks forward to engaging with Keller on future projects and would endorse them for other firms and clients to work with them. Dr. Edward C. Williams, PP., AICP, CSI Director of Planning and Development City of Camden, New Jersey