Walnut Grove Bridge

Responsibilities

  • Survey
  • Easement Right-of-Way Plans
  • Base Mapping
  • Courthouse Research
  • Utility Coordination
  • Hydrology and Hydraulics
  • Drainage Design
  • Permitting
  • Preliminary and Final Design of Bridge Rehabilitation
  • Preliminary and Final Design Roadway/Highway - Rehabilitation
  • Preliminary and Final Design Roadway/Highway - Safety improvements
  • Traffic Control
  • Erosion Control/NPDES Permitting
  • Construction Inspection
  • Construction Management

Owner

Huntingdon County

Project Details

The project consisted of a superstructure replacement and widening of the bridge having three 57’-0” spans. The existing steel superstructure was removed and replaced with new steel I-beams and a concrete deck. The deck and all substructure units were widened to accommodate two traffic lanes. Total project length was 630’-0” including approach roadway and drainage facilities.

The bridge is located directly adjacent a church. Care was taken to minimize impact to the church and associated parking facilities. Additionally, the project included several environmental concerns. Stream disturbance was minimized to avoid impact to a species of concern.

Photos

We have worked with Keller Engineers for structural and civil engineering support on six projects over the past five years and have been very pleased with the results. Our projects tend to be complicated phased renovation/ addition projects calling for creativity in planning and construction.  I have been particularity pleased with their responsiveness to issues that arise during construction which is of particular importance to us and our clients. Vern L. McKissick, III, AIA, LEED AP, Owner/Architect McKissick Associates