Owner: Sheetz, Inc. Claysburg, PA Project Description:

Keller Engineers Water/Wastewater team designed a 40,000 GPD pre-treatment facility/SBR style plant for Sheetz Brothers Kitchen. The team also provided construction administration.

The facility was built to meet the pre-treatment requirements of Greenfield Township wastewater system to pre-treat food waste before it enters the Township’s wastewater collection system.

Keller Engineers Land Development/Site team provided the civil engineering for the Sheetz Brothers Kitchen facility, parking lot, and storm water.