West Providence Township Municipal Authority
The purpose of this project was to eliminate/reduce Inflow & Infiltration from the WPTMA’s collection system. The Authority and the Borough of Everett were under a corrective action plan from the Pennsylvania Department of Environmental Protection.
Contract 1 replaced approximately 8,000 LF of 8” of gravity sewer main, manhole replacement, lateral re-connections, related appurtenances and restoration.
Contract 2 replaced approximately 25,000 LF of 8” gravity sewer main, manhole replacement, lateral re-connections, related appurtenances and restoration.
Contract 3: replaced 3 pump stations.
A new collection system and 3 pump stations were built while maintaining operations of their existing systems.
Keller Engineers has been an extremely valuable asset for us in the development/construction of our store sites by providing accurate and timely structural and site development drawings and answers to related questions. Their response and turn-around time to the Sheetz Store Development Department has been outstanding. We have no hesitation in turning to Keller Engineers for our store structural and site development needs. Joe S. Sheetz, Executive Vice President, Finance & Store Development Sheetz Corporation