West Providence Township Municipal Authority
The purpose of this project was to eliminate/reduce Inflow & Infiltration from the WPTMA’s collection system. The Authority and the Borough of Everett were under a corrective action plan from the Pennsylvania Department of Environmental Protection.
Contract 1 replaced approximately 8,000 LF of 8” of gravity sewer main, manhole replacement, lateral re-connections, related appurtenances and restoration.
Contract 2 replaced approximately 25,000 LF of 8” gravity sewer main, manhole replacement, lateral re-connections, related appurtenances and restoration.
Contract 3: replaced 3 pump stations.
A new collection system and 3 pump stations were built while maintaining operations of their existing systems.
Keller Engineers has been the partnering Engineer firm for Bedford Joint Municipal Authority since 2009. Keller Engineers were a key component in every area from design to construction for the first phase of Shuster Way Heritage trail that was completed in 2015. Our partnership with Keller Engineers continued as we designed and completed the 2nd phase of the Shuster Way Heritage Trail in September of 2023. The staff are professional, passionate, and dedicated to a project from the beginning to completion. On behalf of Bedford Joint Municipal Authority, I would highly recommend Keller Engineers, Inc. Brian Sell, Chairman Bedford Joint Municipal Authority