Walter Business Park

Responsibilities

  • Survey
  • Construction Stakeouts
  • Base Mapping
  • Courthouse Research
  • Wetlands Stakeout
  • Subdivision Plan
  • Due Diligence/Site Feasibility Studies
  • Site Planning, Design, and Layout
  • Landscape Architecture
  • General and Joint Permits
  • Utility Coordination
  • Erosion/Sedimentation Control Plans
  • NPDES Permitting
  • Storage, Distribution, and Transmission Design
  • Wastewater Collection and Pumping Facilities

Owner

Altoona-Blair County Development Corporation, Blair County

Project Details

This project consisted of survey, design, and construction inspection of 2,500’ of Township roadway improvements, improvements to State Route 3006, 2,000’ of roadway within the park, 6,500’ of 16” DEP related drainage improvements, and site work to develop a 100-acre site into two industrial lots.

Additionally, the project included upgrades and widening of existing roads to service the park.  The design was accelerated to accommodate the opening of the newly constructed 279,000 SF Sheetz Distribution Center as the park’s first tenant.

Photos

Penn Cambria School District has collaborated the last 4 years with the Keller Engineer’s team to complete a multi-phased paving and drainage project on our HS campus. I have personally worked with Adam Long, Brian Smith and Shawn Ritchey throughout the entire project and they made Penn Cambria feel like we were their only client. The personal attention to our needs and specific details of this project were second to none. The communication aspect of the Keller Engineer Team was outstanding. We trust their process, their design and their commitment to a quality project that when completed, we are all very proud of. Bill Marshall, Superintendent Penn Cambria School District