Urology Specialist of West Florida. Pinellas County, Florida
This project, a renovation to an existing 3,500 SF concrete block building, was subject to extreme wind conditions.
Keller Engineers structural team modified the existing structure to withstand the wind loads, and reinforced the foundations to support the heavy loads from radiation shielding and oncology treatment equipment. The cantilevered awnings were especially challenging due to the extreme weather conditions.
Keller Engineers has been an extremely valuable asset for us in the development/construction of our store sites by providing accurate and timely structural and site development drawings and answers to related questions. Their response and turn-around time to the Sheetz Store Development Department has been outstanding. We have no hesitation in turning to Keller Engineers for our store structural and site development needs. Joe S. Sheetz, Executive Vice President, Finance & Store Development Sheetz Corporation