University Park Airport – Crosswinds Parking Lot

Responsibilities

  • Due Diligence/Site Feasibility Studies
  • Survey
  • Base Mapping
  • Courthouse Research
  • Site Planning, Design, and Layout
  • Parking Lot Design
  • Permitting
  • Easement Right-of-Way Plans
  • Landscape Plan
  • Grading
  • Utility Coordination
  • Design of Foundations and Retaining Walls
  • Municipal Reviews
  • Sewage Facilities Planning
  • Wastewater Collection and Pumping Facilities
  • Erosion/Sedimentation Control Plans
  • NPDES Permitting
  • Stormwater Management, Analysis, Design, and Permitting
  • Signage
  • Pavement Markings

Owner

Centre County Airport Authority, Centre County

Project Details

This project, located on a 20-acre site, included the expansion of public parking facilities with 503 parking stalls, ADA compliant pedestrian walkways and curb ramps, a bus shelter, and exit kiosk.

Project Challenges/Uniqueness:

  • The design of facilities in this project had to be in conformance with FAA regulations and requirements relative to air navigation safety.

Photos

Penn Cambria School District has collaborated the last 4 years with the Keller Engineer’s team to complete a multi-phased paving and drainage project on our HS campus. I have personally worked with Adam Long, Brian Smith and Shawn Ritchey throughout the entire project and they made Penn Cambria feel like we were their only client. The personal attention to our needs and specific details of this project were second to none. The communication aspect of the Keller Engineer Team was outstanding. We trust their process, their design and their commitment to a quality project that when completed, we are all very proud of. Bill Marshall, Superintendent Penn Cambria School District

Contact Us Today!

Send Us a Message