Theater Drive

Responsibilities

  • Survey
  • Courthouse Research
  • Grading Plan
  • Drainage
  • Site Planning, Design, and Layout
  • Landscape Architecture
  • Utility Design/Coordination
  • Stormwater Management
  • Approvals
  • Permitting
  • Landscape Plans
  • Parking Lot Design
  • Roadway Design

Owner

Various, Blair County

Project Details

Keller Engineers provided all necessary survey and civil engineering services to design and construct a new 90+ acre industrial park, as well as prepare pads for the following businesses.

  • Old Dominion Freight Line Terminal: 17,700 SF truck terminal and office
  • Value Distribution Center: 167,400 SF distribution center and office space
  • FedEx Ground: 116,600 SF distribution center and office
  • Sheetz, Inc./CLI Transport Terminal: 3,000 SF office, tanker truck fueling station, and 12,000 SF truck wash bay for Sheetz, Inc. fuel trucks
  • Fox & James: 10,000 SF truck repair garage with vehicle turning area
  • Refueling Station: Gravel pad with filling station for natural gas-powered vehicles
  • Valley Tire: 39,000 SF tire change/repair garage with warehouse and office area
  • Site development services and survey on a 15-acre site for future development.

Photos

Keller Engineers has been the partnering Engineer firm for Bedford Joint Municipal Authority since 2009. Keller Engineers were a key component in every area from design to construction for the first phase of Shuster Way Heritage trail that was completed in 2015. Our partnership with Keller Engineers continued as we designed and completed the 2nd phase of the Shuster Way Heritage Trail in September of 2023. The staff are professional, passionate, and dedicated to a project from the beginning to completion. On behalf of Bedford Joint Municipal Authority, I would highly recommend Keller Engineers, Inc. Brian Sell, Chairman Bedford Joint Municipal Authority