The Pennsylvania State University Altoona Campus

Adler Athletic Complex Expansion

Responsibilities

  • Survey
  • Site Planning, Design, and Layout
  • Landscape Architecture
  • General and Joint Permits
  • Utility Coordination
  • Sewage Facilities Planning
  • Erosion/Sedimentation Control Plans
  • NPDES Permitting
  • Stormwater Management, Analysis, Design, and Permitting
  • Floodplain Coordination
  • Wetland Investigations, Delineation, and Mitigation Plans

Owner

The Pennsylvania State University

Project Details

This project included a 37,000 SF expansion to the existing Adler building. The expansion houses classrooms, a new gymnasium, and fitness center. The construction of six new tennis courts was also included in the project.

After a complete study of Spring Run to determine the location of the 100-year floodplain, stormwater for the project was managed with four Bio Retention areas placed in strategic locations around the perimeter of the building. Also included are two underground pipe detention systems, and a series of infiltration trenches. Managed stormwater is then released directly to Spring Run and the existing stormwater conveyance system.

Project Uniqueness/Challenges:

  • Relocation of all existing utilities, location of private utility service lines, and existing stormwater conveyance pipe provided design constraints.
  • The schedule of construction was dependent upon PSU Altoona’s schedule as the existing building continued operations through most of the construction.

Photos

[Brian Moore] has kept me informed every step of the way on the front lines of this project. With this being my first project and me still being on a huge learning curve, that speaks volumes about Keller Engineers and Brian’s commitment to your customers. Chuck Case, Manager Falls Creek Borough, Jefferson County