PA Army National Guard / PA Department of General Services / Department of Military and Veterans Affairs
This project included the construction of new Readiness Center/Armory on 20 acres of Department of Military and Veteran’s Affairs (DMVA) land.
The design contract had two phases. Phase 1 included a schematic design/engineering. Phase 2 – site design and construction documents – was awarded to Keller Engineers as part of a Design-Build Contract. The project included numerous design details for security and Anti-Terrorist/Force Protection measures. The project design evolved as construction documents were being finished through negotiations with the DMVA.
Project Uniqueness/Challenges: Rigorous Department of General Services procedures and review processes were required. The redesign of a major storm water conveyance swale was required due to the detection of an unmarked gas main.
Keller Engineers has been the partnering Engineer firm for Bedford Joint Municipal Authority since 2009. Keller Engineers were a key component in every area from design to construction for the first phase of Shuster Way Heritage trail that was completed in 2015. Our partnership with Keller Engineers continued as we designed and completed the 2nd phase of the Shuster Way Heritage Trail in September of 2023. The staff are professional, passionate, and dedicated to a project from the beginning to completion. On behalf of Bedford Joint Municipal Authority, I would highly recommend Keller Engineers, Inc. Brian Sell, Chairman Bedford Joint Municipal Authority