Spring Cove Elementary School

Responsibilities

  • Survey
  • Site Planning, Design, and Layout
  • Parking Lot Plan
  • Design of ADA Compliant Sidewalks and Curb Ramps
  • Landscape Architecture
  • Driveways
  • Utility Coordination
  • Sewage Facilities Planning
  • Erosion/Sedimentation Control Plans
  • Stormwater Management, Analysis, Design, and Permitting
  • Landscape Architecture
  • Design of a Playground
  • Design of a Basketball Court

Owner

Spring Cove School District

Project Details

This project saw the construction of a new elementary school building and related amenities. Roadway improvements and a new signalized intersection needed to be coordinated with site engineering and permitting.

Construction of multiple bioretention basins and standard detention basins were needed to handle the substantial increase in impervious cover.

Photos

Penn Cambria School District has collaborated the last 4 years with the Keller Engineer’s team to complete a multi-phased paving and drainage project on our HS campus. I have personally worked with Adam Long, Brian Smith and Shawn Ritchey throughout the entire project and they made Penn Cambria feel like we were their only client. The personal attention to our needs and specific details of this project were second to none. The communication aspect of the Keller Engineer Team was outstanding. We trust their process, their design and their commitment to a quality project that when completed, we are all very proud of. Bill Marshall, Superintendent Penn Cambria School District