Red Mill Water and Wastewater System

Responsibilities

  • Survey
  • Mapping Control
  • Easement Right-of-Way Plans
  • Base Mapping
  • Courthouse Research
  • Utility Coordination
  • Wetlands Stakeout
  • Design of Water Treatment and Pumping Facilities
  • Design of Storage, Distribution, and Transmission
  • Rate and Tap Fee Analysis
  • Permitting
  • Construction Inspection and Management
  • Grant and Funding Applications
  • Design of Wastewater Collection and Pumping Facilities
  • Bidding Services
  • Act 537 Plans

Owner

Falls Creek Borough Municipal Authority, Jefferson County

Project Details

This project included the design of a 22,000 LF water system expansion, a 19,000 LF wastewater extension, water storage facility, booster pumping facilities, water treatment plant modification, a computerized treatment process control system, and related appurtenances. The water main was constructed in a common trench with the wastewater extension and included a wastewater pumping station.

Photos

We have worked with Keller Engineers for structural and civil engineering support on six projects over the past five years and have been very pleased with the results. Our projects tend to be complicated phased renovation/ addition projects calling for creativity in planning and construction.  I have been particularity pleased with their responsiveness to issues that arise during construction which is of particular importance to us and our clients. Vern L. McKissick, III, AIA, LEED AP, Owner/Architect McKissick Associates