Penn Cambria School District, Cambria County
The project included improvements and reconstruction of pavement areas around the nearly 3-acre school campus. Specific work includes sidewalk and curb repairs, ADA curb ramp construction, signage and pavement markings, rehabilitation of the gravel overflow parking lot, and waterline replacement. Additionally, grading on the west side of the High School was completed to remove the driveway and reconfigure Auditorium parking.
Project Challenges/Uniqueness:
Penn Cambria School District has collaborated the last 4 years with the Keller Engineer’s team to complete a multi-phased paving and drainage project on our HS campus. I have personally worked with Adam Long, Brian Smith and Shawn Ritchey throughout the entire project and they made Penn Cambria feel like we were their only client. The personal attention to our needs and specific details of this project were second to none. The communication aspect of the Keller Engineer Team was outstanding. We trust their process, their design and their commitment to a quality project that when completed, we are all very proud of. Bill Marshall, Superintendent Penn Cambria School District