Penn Cambria School District, Cambria County
The project included improvements and reconstruction of pavement areas around the nearly 3-acre school campus. Specific work includes sidewalk and curb repairs, ADA curb ramp construction, signage and pavement markings, rehabilitation of the gravel overflow parking lot, and waterline replacement. Additionally, grading on the west side of the High School was completed to remove the driveway and reconfigure Auditorium parking.
Project Challenges/Uniqueness:
Keller Engineers has been the partnering Engineer firm for Bedford Joint Municipal Authority since 2009. Keller Engineers were a key component in every area from design to construction for the first phase of Shuster Way Heritage trail that was completed in 2015. Our partnership with Keller Engineers continued as we designed and completed the 2nd phase of the Shuster Way Heritage Trail in September of 2023. The staff are professional, passionate, and dedicated to a project from the beginning to completion. On behalf of Bedford Joint Municipal Authority, I would highly recommend Keller Engineers, Inc. Brian Sell, Chairman Bedford Joint Municipal Authority