Patton Municipal Authority Water System Improvements

Responsibilities

  • Grant and Funding Applications
  • Survey
  • Mapping Control
  • Easement Right-of-Way Plans
  • Base Mapping
  • Courthouse Research
  • Utility Coordination
  • Wetlands Stakeout
  • Subdivision Plan
  • Design of Water Treatment and Pumping Facilities
  • Design of Storage, Distribution, and Transmission Design
  • Rate and Tap Fee Analysis
  • Well Development
  • Permitting
  • Bidding Services
  • Construction Inspection and Management

Owner

Patton Municipal Authority, Cambria County

Project Details

This six-contract project was undertaken to replace an existing surface water source with public supply wells, and to interconnect with the neighboring Elder Township Authority.

Design and construction services were provided for two-220 gallons per minute wells, a water treatment facility, a booster pumping station, a 125,000 gallon water storage tank, radio system controls, and 22,000 LF of water transmission main.

Photos

Keller Engineers has been an extremely valuable asset for us in the development/construction of our store sites by providing accurate and timely structural and site development drawings and answers to related questions.  Their response and turn-around time to the Sheetz Store Development Department has been outstanding. We have no hesitation in turning to Keller Engineers for our store structural and site development needs. Joe S. Sheetz, Executive Vice President, Finance & Store Development Sheetz Corporation

Contact Us Today!

Send Us a Message