Patton Municipal Authority Water System Improvements

Responsibilities

  • Grant and Funding Applications
  • Survey
  • Mapping Control
  • Easement Right-of-Way Plans
  • Base Mapping
  • Courthouse Research
  • Utility Coordination
  • Wetlands Stakeout
  • Subdivision Plan
  • Design of Water Treatment and Pumping Facilities
  • Design of Storage, Distribution, and Transmission Design
  • Rate and Tap Fee Analysis
  • Well Development
  • Permitting
  • Bidding Services
  • Construction Inspection and Management

Owner

Patton Municipal Authority, Cambria County

Project Details

This six-contract project was undertaken to replace an existing surface water source with public supply wells, and to interconnect with the neighboring Elder Township Authority.

Design and construction services were provided for two-220 gallons per minute wells, a water treatment facility, a booster pumping station, a 125,000 gallon water storage tank, radio system controls, and 22,000 LF of water transmission main.

Photos

We are very proud of our new office addition. Keller Engineers provided excellent guidance and support throughout our building project, which included key elements such as: structural recommendations, land development, environmental planning, and a beautiful rain garden. We knew we could trust the expertise of Adam Long, RLA and Brian Smith, PE in helping us create a practical and beautiful building and streetscape that enhances our neighborhood and the community. Dr. Alice Plummer Joyce, Altoona Dermatology Associates

Contact Us Today!

Send Us a Message