Mount Union Municipal Authority Water System

Responsibilities

  • Grant and Funding Applications
  • Survey
  • Mapping Control
  • Easement Right-of-Way Plans
  • Base Mapping
  • Courthouse Research
  • Utility Coordination
  • Wetlands Stakeout
  • Storage, Distribution, and Transmission Design
  • Rate and Tap Fee Analysis
  • Permitting
  • Bidding Services
  • Construction Inspection and Management

Owner

Mount Union Borough, Huntingdon County

Project Details

This project included the replacement/relocation of 1,200 LF of 8” DIP water main and 1,050 LF of 8” PVC sewer main, service connections, and related appurtenances to accommodate future construction.

Photos

Penn Cambria School District has collaborated the last 4 years with the Keller Engineer’s team to complete a multi-phased paving and drainage project on our HS campus. I have personally worked with Adam Long, Brian Smith and Shawn Ritchey throughout the entire project and they made Penn Cambria feel like we were their only client. The personal attention to our needs and specific details of this project were second to none. The communication aspect of the Keller Engineer Team was outstanding. We trust their process, their design and their commitment to a quality project that when completed, we are all very proud of. Bill Marshall, Superintendent Penn Cambria School District

Contact Us Today!

Send Us a Message