Mastery Pyne Poynt High School

Responsibilities

  • On-site Construction Inspection
  • Participate in Progress Meetings
  • Prepare Inspection Reports
  • Preparation of As-builts
  • Provide Quantities for Payment Vouchers
  • Conduct Final Inspection
  • Resolve Punch-list Items
  • Prepare Closeout Documentation

Owner

Mastery Pyne Poynt High School

Project Details

Keller Engineers completed the 3rd party inspection services for the conversion of an existing 1960’s era middle school into a 105,000 SF state-of-the-art, technology-enriched high school for Mastery Charter Schools.

Site improvements included demolition, grading, earthwork, placement of subgrade, DGA subbase, WMA and HMA pavement, stormwater management, construction of curbing and sidewalk in the parking lot, building access and perimeter, ADA compliant handicap curbs and ramps, hardscaping with brick pavers (for bus turnaround) and landscaping.  Other site features included the construction of two rain gardens, handling of contaminated onsite materials, placement of pervious concrete pads and paving using GPS grading.

Photos

All work products from Keller were outstanding and well prepared. All reports were timely and accurate, making it much easier for project close-out in the design phase. Keller office staff also submitted required documents timely and without error. Keller’s full understanding of the project’s requirements made our work as a municipal department much easier. The City of Camden looks forward to engaging with Keller on future projects and would endorse them for other firms and clients to work with them. Dr. Edward C. Williams, PP., AICP, CSI Director of Planning and Development City of Camden, New Jersey

Contact Us Today!

Send Us a Message