Lake Raystown Resort, Huntingdon County
This project, located on a 5-acre lot owned by the Army Corp of Engineers, included a design and construction of a 20,000 SF rustic, two-story structure built on a steep hillside overlooking Lake Raystown. Keller Engineers’ responsibilities primarily included the survey, civil and structural engineering, and construction administration of this lake-side conference center.
Keller Engineers has been the partnering Engineer firm for Bedford Joint Municipal Authority since 2009. Keller Engineers were a key component in every area from design to construction for the first phase of Shuster Way Heritage trail that was completed in 2015. Our partnership with Keller Engineers continued as we designed and completed the 2nd phase of the Shuster Way Heritage Trail in September of 2023. The staff are professional, passionate, and dedicated to a project from the beginning to completion. On behalf of Bedford Joint Municipal Authority, I would highly recommend Keller Engineers, Inc. Brian Sell, Chairman Bedford Joint Municipal Authority