Jackson East Taylor Sewer Authority, Cambria County
Wastewater Extension: This project involved construction of approximately 19,500 LF of 8” and 6” PVC wastewater main and 2,716 LF of 4” PVC force main, manholes, related appurtenances, and restoration.
The Pump Station project included the construction of two new pump stations, reconstruction of the existing Pump Station #12, and replacement of pumps at the existing Pump Stations #3 and #7, along with related appurtenances and restoration. The information will be entered into the Authority’s existing GIS system.
Municipal Building: This project included demolition of the existing office, utility relocation, a new 1,400 SF office building, design of an ADA concrete sidewalk and parking lot, new signage and two defined entrance/exit locations onto the state road.
We have teamed with Keller Engineers on several design-build projects for PennDOT. When selecting a designer, the more critical factors are trust and competence, more so than a low price. If your designer makes a mistake in quantities it can cost you a lot of money. We have stayed with Keller Engineers because we trust them to provide competent service at a competitive price. S. Scott Grannas, Vice President Grannas Bros. Stone & Asphalt Co., Inc.