PennDOT District 2-0, Centre County
Preliminary/Final Design and Construction Services provided for this project which included the reconstruction and widening for signalized intersection improvements to SR 0026 with SR 0045 and a bridge replacement. The new bridge was a 39’-0”’ span P/S concrete adjacent box beam superstructure on concrete abutments. The overall project included 2,932’ of approach roadway and intersection improvements. A temporary road was used to maintain traffic during construction allowing the new structure to be built on the existing alignment as well as phased construction to keep the intersection open to traffic during construction.
We are very proud of our new office addition. Keller Engineers provided excellent guidance and support throughout our building project, which included key elements such as: structural recommendations, land development, environmental planning, and a beautiful rain garden. We knew we could trust the expertise of Adam Long, RLA and Brian Smith, PE in helping us create a practical and beautiful building and streetscape that enhances our neighborhood and the community. Dr. Alice Plummer Joyce, Altoona Dermatology Associates