Huntingdon Area School District
The new 110,000 SF, two-story school was constructed on the existing middle school parking lot. Because the soil was highly expansive, the foundations for the first-floor construction are caissons to bedrock with concrete grade beams and shallow precast double tees. The construction is a combination of precast walls and roof planks, as well as load bearing masonry walls.
The existing middle school was demolished upon completion of the new school.
Penn Cambria School District has collaborated the last 4 years with the Keller Engineer’s team to complete a multi-phased paving and drainage project on our HS campus. I have personally worked with Adam Long, Brian Smith and Shawn Ritchey throughout the entire project and they made Penn Cambria feel like we were their only client. The personal attention to our needs and specific details of this project were second to none. The communication aspect of the Keller Engineer Team was outstanding. We trust their process, their design and their commitment to a quality project that when completed, we are all very proud of. Bill Marshall, Superintendent Penn Cambria School District