Hollidaysburg Public Library

Responsibilities

  • Survey
  • Courthouse Research
  • Subdivision Plan
  • Due Diligence/Site Feasibility Studies
  • Site Planning, Design, and Layout
  • Parking Lot Plan
  • Design of ADA Compliant Sidewalks and Curb Ramps
  • Landscape Architecture
  • Utility Coordination
  • Sewage Facilities Planning
  • Erosion/Sedimentation Control Plans
  • NPDES Permitting
  • Stormwater Management, Analysis, Design, and Permitting
  • Wetland Investigations, Delineation, and Mitigation Plans

Owner

Hollidaysburg Library Foundation

Project Details

This project included design and construction of a new full-service library located near the Hollidaysburg Jr. and Sr. High Schools.

The new location offers more parking and better handicapped accessibility than the previous site. The facility includes a community room that can be rented by the public for events or meetings and features an outdoor classroom/reading garden.

Photos

Penn Cambria School District has collaborated the last 4 years with the Keller Engineer’s team to complete a multi-phased paving and drainage project on our HS campus. I have personally worked with Adam Long, Brian Smith and Shawn Ritchey throughout the entire project and they made Penn Cambria feel like we were their only client. The personal attention to our needs and specific details of this project were second to none. The communication aspect of the Keller Engineer Team was outstanding. We trust their process, their design and their commitment to a quality project that when completed, we are all very proud of. Bill Marshall, Superintendent Penn Cambria School District

Contact Us Today!

Send Us a Message