Falls Creek Borough – City of DuBois Water Interconnections

Responsibilities

  • Grant and Funding Applications
  • Survey
  • Mapping Control
  • Easement Right-of-Way Plans
  • Base Mapping
  • Courthouse Research
  • Utility Coordination
  • Wetlands Stakeout
  • Storage, Distribution, and Transmission Design
  • Rate and Tap Fee Analysis
  • Permitting
  • Bidding Services
  • Construction Inspection and Management

Owner

Falls Creek Borough Municipal Authority, Clearfield County

Project Details

This project included the design and construction of a waterline interconnection with the City of Dubois. This 25,000 LF stretch of waterline provides the Municipal Authority with water directly from the City of Dubois. This enabled them to eliminate their Water Treatment Facilities and their surface water source. In addition, the project included communications upgrades to their existing water system which monitors tank levels, control booster station operation, and regulates the inflow of purchased water.

Photos

[Brian Moore] has kept me informed every step of the way on the front lines of this project. With this being my first project and me still being on a huge learning curve, that speaks volumes about Keller Engineers and Brian’s commitment to your customers. Chuck Case, Manager Falls Creek Borough, Jefferson County