Falls Creek Borough Municipal Authority, Clearfield County
This project included the design and construction of a waterline interconnection with the City of Dubois. This 25,000 LF stretch of waterline provides the Municipal Authority with water directly from the City of Dubois. This enabled them to eliminate their Water Treatment Facilities and their surface water source. In addition, the project included communications upgrades to their existing water system which monitors tank levels, control booster station operation, and regulates the inflow of purchased water.
I probably don’t say this enough, but we so appreciate the quality of work Keller Engineers does. The fact that they include building footprints and natural features makes these surveys super useful. I’m reminding my colleagues in other counties that their surveyors need to up their quality. F. Mark Schiavone, Executive Director Berkeley County Farmland Protection Board