Responsibilities

  • Grant and Funding Applications
  • Survey
  • Mapping Control
  • Easement Right-of-Way Plans
  • Base Mapping
  • Courthouse Research
  • Utility Coordination
  • Wetlands Stakeout
  • Storage, Distribution, and Transmission Design
  • Rate and Tap Fee Analysis
  • Permitting
  • Bidding Services
  • Construction Inspection and Management

Owner

Falls Creek Borough Municipal Authority, Clearfield County

Project Details

This project included the design and construction of a waterline interconnection with the City of Dubois. This 25,000 LF stretch of waterline provides the Municipal Authority with water directly from the City of Dubois. This enabled them to eliminate their Water Treatment Facilities and their surface water source. In addition, the project included communications upgrades to their existing water system which monitors tank levels, control booster station operation, and regulates the inflow of purchased water.

Photos

Keller Engineers has been the partnering Engineer firm for Bedford Joint Municipal Authority since 2009. Keller Engineers were a key component in every area from design to construction for the first phase of Shuster Way Heritage trail that was completed in 2015. Our partnership with Keller Engineers continued as we designed and completed the 2nd phase of the Shuster Way Heritage Trail in September of 2023. The staff are professional, passionate, and dedicated to a project from the beginning to completion. On behalf of Bedford Joint Municipal Authority, I would highly recommend Keller Engineers, Inc. Brian Sell, Chairman Bedford Joint Municipal Authority