East Conemaugh Borough, Cambria County
The age, inaccessibility, and materials of construction of the Borough’s combined system made repair/separation impossible. Tests determined that the most cost-effective option was to install a new separate wastewater system.
Keller Engineers’ team designed a new 30,000 LF wastewater collection system. Laterals were extended to within 4’ of the structure to be served. The Borough’s existing combined storm/sewer system remained a stormwater system.
We have worked with Keller Engineers for structural and civil engineering support on six projects over the past five years and have been very pleased with the results. Our projects tend to be complicated phased renovation/ addition projects calling for creativity in planning and construction. I have been particularity pleased with their responsiveness to issues that arise during construction which is of particular importance to us and our clients. Vern L. McKissick, III, AIA, LEED AP, Owner/Architect McKissick Associates