Design/Construction Inspection for Five Dam Structures

Responsibilities

  • Design of Plans, Details, and Erosion Control Measures
  • Develop Specifications/Bid Documents
  • Post Design (including shop drawing/catalog cut reviews)
  • Permitting
  • Provide Construction Inspection Support to the County
  • Submit PS&E Documents
  • Address Deterioration and Erosion of Dam Structures
  • Prepare a Change of Plan for Atco Lake Dam to Stabilize Advanced Deterioration
  • Coordinate Lane Closures along Route 30 with New Jersey Department of Transportation

Owner

New Jersey Department of Public Works

Project Details

The project included the repair/rehabilitation of five dam structures in throughout Camden County to address comments received during the 2015 annual dam inspections, field reconnaissance, and collaboration with the New Jersey Department of Environmental Protection’s (NJDEP) Division of Dam Safety & Flood Control.

Project Uniqueness/Challenges 

  • Design, documentation, and engineers estimate was accelerated so the project could be advertised for construction two months after receiving Notice to Proceed.
  • Extensive coordination with NJDEP’s Dam Safety & Flood Control group was necessary in order to obtain “buy-in” and project.

Photos

 

All work products from Keller were outstanding and well prepared. All reports were timely and accurate, making it much easier for project close-out in the design phase. Keller office staff also submitted required documents timely and without error. Keller’s full understanding of the project’s requirements made our work as a municipal department much easier. The City of Camden looks forward to engaging with Keller on future projects and would endorse them for other firms and clients to work with them. Dr. Edward C. Williams, PP., AICP, CSI Director of Planning and Development City of Camden, New Jersey

Contact Us Today!

Send Us a Message