PennDOT District 2-0, McKean County
This project included the replacement of the existing bridge carrying SR 0346 (Derrick Road) over Foster Brook Tributary in Foster Township, McKean County. The new structure is a single cell precast concrete box culvert with a total opening equal to 20′-0″ wide by 5′-0″ high by 49′-6.5″ long. The project site is located approximately nine miles East of Bradford on SR 0346.
Keller Engineers has been the partnering Engineer firm for Bedford Joint Municipal Authority since 2009. Keller Engineers were a key component in every area from design to construction for the first phase of Shuster Way Heritage trail that was completed in 2015. Our partnership with Keller Engineers continued as we designed and completed the 2nd phase of the Shuster Way Heritage Trail in September of 2023. The staff are professional, passionate, and dedicated to a project from the beginning to completion. On behalf of Bedford Joint Municipal Authority, I would highly recommend Keller Engineers, Inc. Brian Sell, Chairman Bedford Joint Municipal Authority