City of Camden, Curb Ramp ADA Improvements, Phase II

Responsibilities

  • On-site Construction Inspection
  • Participate in Progress Meetings
  • Prepare Inspection Reports
  • Preparation of As-builts
  • Provide Quantities for Payment Vouchers
  • Conduct Final Inspection
  • Resolve Punch-list Items
  • Prepare Closeout Documentation

Owner

City of Camden, New Jersey

Project Details

The project was undertaken to provide safe pedestrian crossing through ADA improvements to intersections at various locations within the City of Camden.   Construction activities included: demolition, new ADA compliant curb ramps with cast-in-place detectable warning surface and concrete curb, modification/new concrete and brick sidewalk approaches, resetting of existing utility castings, resetting and/or relocation of existing signs, partial reconstruction of pavements, and new crosswalk striping.

Photos

It is my pleasure and honor to acknowledge the relationship that Remington & Vernick Engineers, Inc. has developed with Keller Engineers of New Jersey, LLC. I’d like to share one experience that RVE has had with Keller regarding our Camden City ADA Ramp Improvement Project. The inspector was well versed in various areas of construction. The attention to detail that he demonstrated on as-builts, and recordkeeping were excellent, and he was very knowledgeable with meeting all ADA requirements. He developed a great working relationship with both our resident inspector and construction manager, which alleviated many forms of miscommunication which may occur in the field. Joseph R. Ragusa, PE Senior Associate Department Head Infrastructure CM/CI Remmington & Vernick Engineers, Inc.

Contact Us Today!

Send Us a Message