Brownstown Borough, Cambria County
This project began with a study which involved TV inspection, smoke testing, and cost analysis. It was determined that the most efficient, cost-effective solution was to build a new wastewater collection system rather than repair/rehabilitate the existing system.
The new 20,000 LF collection system and laterals resulted in a very tight collection system meeting all required standards – even heavy rainstorms had no impact on the wastewater flows. A Pennsylvania Department of Environmental Resources representative stated that this system is the model for other communities to follow.
Penn Cambria School District has collaborated the last 4 years with the Keller Engineer’s team to complete a multi-phased paving and drainage project on our HS campus. I have personally worked with Adam Long, Brian Smith and Shawn Ritchey throughout the entire project and they made Penn Cambria feel like we were their only client. The personal attention to our needs and specific details of this project were second to none. The communication aspect of the Keller Engineer Team was outstanding. We trust their process, their design and their commitment to a quality project that when completed, we are all very proud of. Bill Marshall, Superintendent Penn Cambria School District