Brownstown Borough Wastewater System

Responsibilities

  • Grant and Funding Applications
  • Survey
  • Mapping Control
  • Easement Right-of-Way Plans
  • Base Mapping
  • Courthouse Research
  • Utility Coordination
  • Wetlands Stakeout
  • Design of Wastewater Collection and Pumping Facilities
  • Rate and Tap Fee Analysis
  • Infiltration/Inflow Analysis
  • Permitting
  • Bidding Services
  • Construction Inspection and Management

Owner

Brownstown Borough, Cambria County

Project Details

This project began with a study which involved TV inspection, smoke testing, and cost analysis. It was determined that the most efficient, cost-effective solution was to build a new wastewater collection system rather than repair/rehabilitate the existing system.

The new 20,000 LF collection system and laterals resulted in a very tight collection system meeting all required standards – even heavy rainstorms had no impact on the wastewater flows. A Pennsylvania Department of Environmental Resources representative stated that this system is the model for other communities to follow.

Photos

[The] entire staff did a wonderful job! We truly appreciate all the hard work in making our bridge project a success and something we can be very proud to have in our township. Bev Sherwood Burns, Supervisor Blacklick Township

Contact Us Today!

Send Us a Message