Bedford Street Improvements

Responsibilities

  • Survey
  • Courthouse Research
  • Site Planning, Design, and Layout
  • Design of Demolition Plans
  • Design of Curbing, Sidewalk, and ADA compliant Curb Ramps
  • Erosion/Sedimentation Control Plans
  • Layout of Traffic Calming Measures
  • Construction Oversight

Owner

Hollidaysburg Borough, Blair County

Project Details

This project was undertaken in order to improve conditions and created a safe corridor for pedestrians, residents, and businesses along the 200, 300, and 400 blocks of Bedford Street. Design documents included replacement of deteriorated and non-ADA-compliant sidewalks, curbs, and curb ramps.

The corridor is primarily single-family homes; however, there are several commercial and civic buildings and a public park. Two speed tables were added to reduce vehicle speed and provide traffic calming measures to this busy street.

Photos

Penn Cambria School District has collaborated the last 4 years with the Keller Engineer’s team to complete a multi-phased paving and drainage project on our HS campus. I have personally worked with Adam Long, Brian Smith and Shawn Ritchey throughout the entire project and they made Penn Cambria feel like we were their only client. The personal attention to our needs and specific details of this project were second to none. The communication aspect of the Keller Engineer Team was outstanding. We trust their process, their design and their commitment to a quality project that when completed, we are all very proud of. Bill Marshall, Superintendent Penn Cambria School District

Contact Us Today!

Send Us a Message