Bedford Street Improvements

Responsibilities

  • Survey
  • Courthouse Research
  • Site Planning, Design, and Layout
  • Design of Demolition Plans
  • Design of Curbing, Sidewalk, and ADA compliant Curb Ramps
  • Erosion/Sedimentation Control Plans
  • Layout of Traffic Calming Measures
  • Construction Oversight

Owner

Hollidaysburg Borough, Blair County

Project Details

This project was undertaken in order to improve conditions and created a safe corridor for pedestrians, residents, and businesses along the 200, 300, and 400 blocks of Bedford Street. Design documents included replacement of deteriorated and non-ADA-compliant sidewalks, curbs, and curb ramps.

The corridor is primarily single-family homes; however, there are several commercial and civic buildings and a public park. Two speed tables were added to reduce vehicle speed and provide traffic calming measures to this busy street.

Photos

[Brian Moore] has kept me informed every step of the way on the front lines of this project. With this being my first project and me still being on a huge learning curve, that speaks volumes about Keller Engineers and Brian’s commitment to your customers. Chuck Case Manager Falls Creek Borough, Jefferson County

Contact Us Today!

Send Us a Message