Atlantic City Expressway Resurfacing Program

Responsibilities

  • On-site Project Construction Inspection
  • Provide Resident Engineer with On-site Technical Support
  • Respond to Contractor Correspondence
  • Record Meeting Minutes
  • Prepare Inspection Reports
  • Respond to Requests for Work Orders and As-builts
  • Review Equal Employment Opportunity Documentation
  • Provide Resident Engineer with Quantities for Monthly Payment Vouchers
  • Final Inspection
  • Resolution of punch-list activities
  • Prepare Closeout Documentation

Owner

South Jersey Transportation Authority, Atlantic County, NJ

Project Details

Keller Engineers of New Jersey provided night-time construction inspection services and maintaining a State of Good Repair, safety, and customer satisfaction for 14.2 miles of the Atlantic City Expressway mainline. Responsibilities for this project included MPT/construction staging, HMA milling and resurfacing the full-width roadway (shoulder to shoulder), placement of temporary/permanent traffic striping and pavement markings, concrete demolition and repairs, and installation of loop detectors for continuous operation of Express E-Z Pass.

Other construction activities included upgrades to roadway safety features (guiderail and end treatments) and installation of concrete barrier, electrical items, and utilities.

Photos

We have been working with Keller Engineers of New Jersey and have found the firm to exhibit the highest quality of professional engineering. They are exceptionally responsive, supportive, and versatile in all aspects of engineering. The staff is well trained and educated in the forefront of technology. Keller Engineers takes both responsibility and pride in satisfying their customers of which we are grateful to be included. Joe Myers Chief Operating Officer Camden Community Partnership

Contact Us Today!

Send Us a Message