Old Mill Bridge

Responsibilities

  • Survey
  • Easement Right-of-Way Plans
  • Base Mapping
  • Courthouse Research
  • Historic Preservation
  • Utility Coordination
  • Hydrology and Hydraulics
  • Drainage Design
  • Permitting
  • Preliminary and Final Design of Replacement Bridge
  • Preliminary and Final Design Roadway/Highway - Rehabilitation
  • Preliminary and Final Design Roadway/Highway - Safety improvements
  • Traffic Control
  • Erosion Control/NPDES Permitting
  • Construction Inspection
  • Construction Management

Owner

Saltillo Borough, Huntingdon County

Project Details

This project involved replacement of the existing bridge carrying Old Mill Road over North Spring Creek. Improvements consisted of replacing the existing structurally deficient single lane bridge with a new single lane P/S Concrete Spread Box Beam structure. With minor profile adjustments, the new structure was constructed on the existing horizontal roadway alignment. Drainage work, including new inlets, was included to better control drainage adjacent to the historic Hudson Grist Mill property.

Safety improvements were made to the approach roadway and at the intersection of SR 0655 where site distance was a challenge. This project also required improvements that met design criteria to fit into the community context while limiting impacts to the historic mill, the East Broad Top Railroad (a National Historic Landmark) right-of-way, and area wetlands. The mill race drainage structure was required to be extended to accommodate the widened roadway near the mill and a new reinforced concrete headwall was constructed and faced with the masonry stonework from the original headwall.

Photos

Keller Engineers has been the partnering Engineer firm for Bedford Joint Municipal Authority since 2009. Keller Engineers were a key component in every area from design to construction for the first phase of Shuster Way Heritage trail that was completed in 2015. Our partnership with Keller Engineers continued as we designed and completed the 2nd phase of the Shuster Way Heritage Trail in September of 2023. The staff are professional, passionate, and dedicated to a project from the beginning to completion. On behalf of Bedford Joint Municipal Authority, I would highly recommend Keller Engineers, Inc. Brian Sell, Chairman Bedford Joint Municipal Authority