Highland Hall Senior Housing

Responsibilities

  • Survey
  • Site Planning, Design, and Layout
  • Site Grading
  • Utility Coordination
  • Landscape Plan
  • Lighting
  • Stormwater Management Calculations
  • Erosion and Sedimentation Control Plans
  • Land Development Permitting

Owner

Gatesburg Road Development, Blair County

Project Details

The project was a partial renovation and new construction addition to a significant historic property that had been vacant for 15 years.  The original wings of the building had to be demolished, but the core with its cupola was saved and restored.  The additions were designed to emulate the original wings of the building.  The 4-story building was converted into 53 senior apartments with community rooms.

Project Challenges/Uniqueness:

  • The project site has its own zoning district.
  • Keller Engineers’ landscape architect and a retired arborist provided an evaluation of the trees and prepared a plan to remove bad trees and retain those that could be saved. A new tree, planted from seeds that went to the moon on a space mission, is now growing on the site.

Photos

 

Keller Engineers has been the partnering Engineer firm for Bedford Joint Municipal Authority since 2009. Keller Engineers were a key component in every area from design to construction for the first phase of Shuster Way Heritage trail that was completed in 2015. Our partnership with Keller Engineers continued as we designed and completed the 2nd phase of the Shuster Way Heritage Trail in September of 2023. The staff are professional, passionate, and dedicated to a project from the beginning to completion. On behalf of Bedford Joint Municipal Authority, I would highly recommend Keller Engineers, Inc. Brian Sell, Chairman Bedford Joint Municipal Authority