East Conemaugh Borough Wastewater Collection System

Responsibilities

  • Grant and Funding Applications
  • Survey
  • Mapping Control
  • Easement Right-of-Way Plans
  • Base Mapping
  • Courthouse Research
  • Utility Coordination
  • Wetlands Stakeout
  • Design of Wastewater Collection and Pumping Facilities
  • Rate and Tap Fee Analysis
  • Infiltration/Inflow Analysis
  • Permitting
  • Construction Inspection and Management

Owner

East Conemaugh Borough, Cambria County

Project Details

The age, inaccessibility, and materials of construction of the Borough’s combined system made repair/separation impossible. Tests determined that the most cost-effective option was to install a new separate wastewater system.

Keller Engineers’ team designed a new 30,000 LF wastewater collection system. Laterals were extended to within 4’ of the structure to be served. The Borough’s existing combined storm/sewer system remained a stormwater system.

Photos

We are very proud of our new office addition. Keller Engineers provided excellent guidance and support throughout our building project, which included key elements such as: structural recommendations, land development, environmental planning, and a beautiful rain garden. We knew we could trust the expertise of Adam Long, RLA and Brian Smith, PE in helping us create a practical and beautiful building and streetscape that enhances our neighborhood and the community. Dr. Alice Plummer Joyce, Altoona Dermatology Associates