Blue Course Medial Realty Associates, LP, Centre County
This new three-story, 48,000 SF medical building is designed as partial lease space and suites for Martin & Suhey Orthopedics. Keller Engineers team was responsible for the site and structural engineering.
The partial underground first floor is constructed of large retaining walls, light gauge metal stud infilling, and a steel frame which supports the second and third floors. The roof structure is a pitched roof of metal trusses.
Site work on this 6.7-acre lot included design, utilities, access driveway, lighting, landscaping, and a parking lot with 250 parking stalls.
We have teamed with Keller Engineers on several design-build projects for PennDOT. When selecting a designer, the more critical factors are trust and competence, more so than a low price. If your designer makes a mistake in quantities it can cost you a lot of money. We have stayed with Keller Engineers because we trust them to provide competent service at a competitive price. S. Scott Grannas, Vice President Grannas Bros. Stone & Asphalt Co., Inc.