Intersection of SR 26 & SR 45

Responsibilities

  • Preliminary Design
  • Final Design
  • Construction Services
  • Survey

Owner

PennDOT District 2-0, Centre County

Project Details

Preliminary/Final Design and Construction Services provided for this project which included the reconstruction and widening for signalized intersection improvements to SR 0026 with SR 0045 and a bridge replacement. The new bridge was a 39’-0”’ span P/S concrete adjacent box beam superstructure on concrete abutments. The overall project included 2,932’ of approach roadway and intersection improvements. A temporary road was used to maintain traffic during construction allowing the new structure to be built on the existing alignment as well as phased construction to keep the intersection open to traffic during construction.

Photos

[Brian Moore] has kept me informed every step of the way on the front lines of this project. With this being my first project and me still being on a huge learning curve, that speaks volumes about Keller Engineers and Brian’s commitment to your customers. Chuck Case, Manager Falls Creek Borough, Jefferson County

Contact Us Today!

Send Us a Message