Adler Athletic Complex Expansion
The Pennsylvania State University
This project included a 37,000 SF expansion to the existing Adler building. The expansion houses classrooms, a new gymnasium, and fitness center. The construction of six new tennis courts was also included in the project.
After a complete study of Spring Run to determine the location of the 100-year floodplain, stormwater for the project was managed with four Bio Retention areas placed in strategic locations around the perimeter of the building. Also included are two underground pipe detention systems, and a series of infiltration trenches. Managed stormwater is then released directly to Spring Run and the existing stormwater conveyance system.
Project Uniqueness/Challenges:
Keller Engineers has been the partnering Engineer firm for Bedford Joint Municipal Authority since 2009. Keller Engineers were a key component in every area from design to construction for the first phase of Shuster Way Heritage trail that was completed in 2015. Our partnership with Keller Engineers continued as we designed and completed the 2nd phase of the Shuster Way Heritage Trail in September of 2023. The staff are professional, passionate, and dedicated to a project from the beginning to completion. On behalf of Bedford Joint Municipal Authority, I would highly recommend Keller Engineers, Inc. Brian Sell, Chairman Bedford Joint Municipal Authority