Value Distribution Center

Responsibilities

  • Survey
  • Site Planning, Design, and Layout
  • Parking Lot Plan including a Truck Maneuver Court
  • Utility Coordination
  • Sewage Facilities Planning
  • Erosion/Sedimentation Control Plans
  • NPDES Permitting
  • Stormwater Management, Analysis, Design, and Permitting
  • Landscape Architecture
  • Lot Lighting

Owner

Value Drug Company, Blair County

Project Details

This project included the design and construction of a 138,000 SF distribution center and a 29,400 SF attached office on 21.7 acres.

Project Uniqueness/Challenges: Project and approval process possessed an aggressive schedule. Keller Engineers achieved the site design and municipal approvals both in less than three months. The project design involved special security provisions due to the content of the building.

Photos

Penn Cambria School District has collaborated the last 4 years with the Keller Engineer’s team to complete a multi-phased paving and drainage project on our HS campus. I have personally worked with Adam Long, Brian Smith and Shawn Ritchey throughout the entire project and they made Penn Cambria feel like we were their only client. The personal attention to our needs and specific details of this project were second to none. The communication aspect of the Keller Engineer Team was outstanding. We trust their process, their design and their commitment to a quality project that when completed, we are all very proud of. Bill Marshall, Superintendent Penn Cambria School District