Sheetz, Inc., Blair County
Keller Engineers was responsible for the site development of this 37-acre site in Walter Business Park which houses a 139,000 SF food preparation facility. The project was sited in a manner to avoid impacts to wetland resources.
Additionally, Keller Engineers’ Water/Wastewater team was responsible for designing an SBR style pre-treatment plant to meet the requirements of the Greenfield Township wastewater collection system. This 40,000 GPD plant pre-treats bakery waste before it enters the Township’s system. The plant allows Sheetz to house bakery operations near their distribution center.
Penn Cambria School District has collaborated the last 4 years with the Keller Engineer’s team to complete a multi-phased paving and drainage project on our HS campus. I have personally worked with Adam Long, Brian Smith and Shawn Ritchey throughout the entire project and they made Penn Cambria feel like we were their only client. The personal attention to our needs and specific details of this project were second to none. The communication aspect of the Keller Engineer Team was outstanding. We trust their process, their design and their commitment to a quality project that when completed, we are all very proud of. Bill Marshall, Superintendent Penn Cambria School District