Days Inn & Suites Altoona

Responsibilities

  • Survey
  • Site Planning, Design, and Layout
  • Parking Lot Design
  • Stormwater Management
  • Feasibility Study
  • Wetland Investigation
  • Highway Occupancy Permit
  • Individual NPDES Permit

Owner

McCloskey Builders, Inc., Blair County

Project Details

This project included a 55-room, three-story interior corridor hotel, which includes modern design elements that feature a spacious foyer, communal table and more. The hotel offers a meeting room, fitness center, business center, and guest laundry.

The project required an Individual NPDES permit for discharge of post construction stormwater due to its location within a high-quality watershed, hence the light-colored roof to reduce thermal impacts to the high-quality watershed and a large, vegetated infiltration basin to treat stormwater runoff and recharge groundwater.

Photos

Penn Cambria School District has collaborated the last 4 years with the Keller Engineer’s team to complete a multi-phased paving and drainage project on our HS campus. I have personally worked with Adam Long, Brian Smith and Shawn Ritchey throughout the entire project and they made Penn Cambria feel like we were their only client. The personal attention to our needs and specific details of this project were second to none. The communication aspect of the Keller Engineer Team was outstanding. We trust their process, their design and their commitment to a quality project that when completed, we are all very proud of. Bill Marshall, Superintendent Penn Cambria School District

Contact Us Today!

Send Us a Message